STH 441 NB over CTH KK

2.5M N JCT USH 10 · County 015, Wisconsin · Built 1993 · 2 Lanes · 22,250 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B08002700000000
Year Built
1993
Length
49.9 m (163.7 ft)
Max Span
26.4 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
22,250
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.