STH 35 over YELLOW RIVER

5.7M N JCT CTH C · County 013, Wisconsin · Built 2000 · 2 Lanes · 2,700 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
5
Fair

Bridge Details

Structure #
B07004300000000
Year Built
2000
Length
33.3 m (109.3 ft)
Max Span
16 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
2,700
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.