LRD CROSBY RD over N FK CLAM RIVER

0.6M N JCT CTH EE · County 013, Wisconsin · Built 1993 · 2 Lanes · 58 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B07002900000000
Year Built
1993
Length
10.3 m (33.8 ft)
Max Span
9.8 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
58
Material
Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.