LRD GASLYN RD over YELLOW RIVER

0.3M E JCT CTH X · County 013, Wisconsin · Built 1988 · 2 Lanes · 165 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B07001400000000
Year Built
1988
Length
46.3 m (151.9 ft)
Max Span
14.6 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
165
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.