CTH AA over SPRING CREEK

0.3M S JCT CTH F · County 011, Wisconsin · Built 2012 · 2 Lanes · 152 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B06019100000000
Year Built
2012
Length
10.5 m (34.4 ft)
Max Span
9.8 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
152
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.