STH 35-MAIN ST over SPRING CREEK

0.7M N JCT CTH I · County 011, Wisconsin · Built 1988 · 2 Lanes · 2,400 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
B06006500000000
Year Built
1988
Length
6.8 m (22.3 ft)
Max Span
3 m
Lanes
2
Daily Traffic
2,400
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.