IH 41 NB over ASHWAUBENON CREEK

0.1M N JCT CTH F · County 009, Wisconsin · Built 2012 · 3 Lanes · 29,050 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
B05060500000000
Year Built
2012
Length
28.8 m (94.5 ft)
Max Span
27.4 m
Width
20.5 m (67.3 ft)
Lanes
3
Daily Traffic
29,050
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.