LRD PINE GROVE ROA over UNNAMED CREEK

0.6 MI W OF IH 43 · County 009, Wisconsin · Built 2021 · 2 Lanes · 99 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
B05047500000000
Year Built
2021
Length
6.2 m (20.3 ft)
Max Span
6.2 m
Lanes
2
Daily Traffic
99
Material
Aluminum, Wrought Iron, or Cast Iron
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.