STH 96 over UNNAMED CREEK

0.23 MI E OF CTH X LT · County 009, Wisconsin · Built 2022 · 2 Lanes · 3,525 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
B05046800000000
Year Built
2022
Length
12.5 m (41 ft)
Max Span
11.6 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
3,525
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.