LRD VAN LANEN RD over WEQUIOCK CREEK

0.04 MILES WEST OF STH 57 · County 009, Wisconsin · Built 2019 · 2 Lanes · 1,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
B05046300000000
Year Built
2019
Length
7.8 m (25.6 ft)
Max Span
7 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
1,200
Material
Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.