STH 172 EB over CTH H BROADWAY ST

1.4M E JCT USH 41 · County 009, Wisconsin · Built 1974 · 3 Lanes · 42,350 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B05014800000000
Year Built
1974
Length
40.8 m (133.9 ft)
Max Span
21 m
Width
21.5 m (70.5 ft)
Lanes
3
Daily Traffic
42,350
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.