STH 54 EB OFF RAMP over LAND

3.5M E JCT USH 41 TO S · County 009, Wisconsin · Built 1973 · 1 Lanes · 2,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B05013400210000
Year Built
1973
Length
44.8 m (147 ft)
Max Span
16.8 m
Width
7.6 m (24.9 ft)
Lanes
1
Daily Traffic
2,200
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$787,000
Total Project Cost
$1,180,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.