STH 13 over SAND RIVER
2.6M N JCT CTH K TO E · County 007, Wisconsin · Built 1956 · 2 Lanes · 880 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
46.899175, -90.956175
This bridge is in worse condition than 94.2% of bridges in County 007. The average bridge in Wisconsin is 0 years old; this one is 70 years old.
Bridge Details
- Structure #
- B04001100000000
- Year Built
- 1956
- Reconstructed
- 1989
- Length
- 40.7 m (133.5 ft)
- Max Span
- 15.2 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 880
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $561,000
- Total Project Cost
- $841,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.