CTH A over HAY RIVER

0.1M E JCT CTH F · County 005, Wisconsin · Built 1990 · 2 Lanes · 1,120 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B03011200000000
Year Built
1990
Length
29.2 m (95.8 ft)
Max Span
14.3 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
1,120
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.