USH 53 NB over CTH A

7.2M N JCT CTH M TO E · County 005, Wisconsin · Built 1972 · 2 Lanes · 6,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B03001900000000
Year Built
1972
Reconstructed
2022
Length
82.8 m (271.7 ft)
Max Span
36.1 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
6,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.