USH 53 NB over LRD CARLSON SCHOOL DRIVE

1.5M N JCT CTH M TO E · County 005, Wisconsin · Built 1972 · 2 Lanes · 6,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B03001500000000
Year Built
1972
Length
44.9 m (147.3 ft)
Max Span
20.4 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
6,000
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.