LRD E TYLER AVENUE over BAD RIVER

0.3M E JCT STH 13 · County 003, Wisconsin · Built 2024 · 2 Lanes · 120 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
B02007300000000
Year Built
2024
Length
25.1 m (82.3 ft)
Max Span
12.2 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
120
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.