STH 13 over BRUNSWEILER RIVER

0.5M N JCT CTH C · County 003, Wisconsin · Built 1971 · 2 Lanes · 2,800 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B02001300000000
Year Built
1971
Reconstructed
2003
Length
35.9 m (117.8 ft)
Max Span
17.8 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
2,800
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.