LRD 8TH DRIVE over BINGHAM CREEK

0.5M N JCT STH 21 · County 001, Wisconsin · Built 1986 · 2 Lanes · 81 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
B01000800000000
Year Built
1986
Length
8.2 m (26.9 ft)
Max Span
7.6 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
81
Material
Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.