IRR BIA RTE 51 over SO. BRANCH OCONTO RIVER
15 KM SOUTH OF LANGLADE · County 078, Wisconsin · Built 1977 · 2 Lanes · 50 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
45.09135, -88.559075
This bridge is in worse condition than 68% of bridges in County 078. The average bridge in Wisconsin is 0 years old; this one is 49 years old.
Nearby Bridges
IRR BIA RTE 51 over SO. BRANCH OCONTO RIVER
Built 1977
LRD BONITA RD over FIRST S BR OCONTO RIVER
Built 1957
FR 2112 over SO BRANCH OCONTO RIVER
Built 1964
IRR BIA RTE 3 over WOLF RIVER
Built 2005
CTH W over S BR OCONTO RIVER
Built 2000
CTH AA over S BR OCONTO RIVER
Built 2018
CTH M over WOLF RIVER
Built 1985
LRD KINGSTON RD (D over N BR OCONTO RIVER
Built 1969
IRR BIA RTE 1011 over EVERGREEN CREEK
Built 1985
CTH T over S BR OCONTO RIVER
Built 1993
Bridge Details
- Structure #
- 00000000000F905
- Year Built
- 1977
- Length
- 10.1 m (33.1 ft)
- Max Span
- 9.4 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Prestressed Concrete
- Design
- Channel Beam
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $550,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.