CR 2/22 over Big Run

0.02 South of CR 2/20 · County 107, West Virginia · Built 2014 · 1 Lanes · 10 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
00000000054A253
Year Built
2014
Length
15.7 m (51.5 ft)
Max Span
14.3 m
Width
4.7 m (15.4 ft)
Lanes
1
Daily Traffic
10
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$800,000
Total Project Cost
$1,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.