I-77 N and S over WV ROUTE 47

0.68 MILES NORTH OF WV 95 · County 107, West Virginia · Built 2011 · 8 Lanes · 8,550 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
00000000054A247
Year Built
2011
Length
42.3 m (138.8 ft)
Max Span
17.1 m
Width
42.2 m (138.5 ft)
Lanes
8
Daily Traffic
8,550
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,500,000
Total Project Cost
$4,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.