COUNTY ROUTE 7 over RIGHT FORK REEDY CREEK

0.44 MILE WEST CR 7/10 · County 105, West Virginia · Built 1976 · 2 Lanes · 350 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
00000000053A013
Year Built
1976
Length
42.7 m (140.1 ft)
Max Span
20.5 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
350
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$500,000
Total Project Cost
$550,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.