COUNTY ROUTE 34 over LAUREL CREEK

0.07 MI S CO 9 · County 101, West Virginia · Built 1940 · 2 Lanes · 20 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
00000000051A062
Year Built
1940
Length
7.6 m (24.9 ft)
Max Span
6.6 m
Width
5.8 m (19 ft)
Lanes
2
Daily Traffic
20
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$350,000
Total Project Cost
$575,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.