COUNTY ROUTE 3 SLS over HANDY CAMP RUN

0.63 MI E CO 3/1 SLS · County 097, West Virginia · Built 2006 · 2 Lanes · 150 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
00000000049A142
Year Built
2006
Length
13.9 m (45.6 ft)
Max Span
12.2 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
150
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.