Co Rd 7 over Brush Fork

0.01 mi. South jct CR6 · County 095, West Virginia · Built 2024 · 1 Lanes · 400 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
00000000048X001
Year Built
2024
Length
16.9 m (55.4 ft)
Max Span
16.9 m
Width
5.2 m (17.1 ft)
Lanes
1
Daily Traffic
400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.