TAYLOR CO. RT. 7 over THREE FORK CREEK

0.02 MI. W. TAY CO RT 30 · County 091, West Virginia · Built 2010 · 2 Lanes · 300 vehicles/day

Overall
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
00000000046A091
Year Built
2010
Length
31.5 m (103.3 ft)
Max Span
30.5 m
Width
6.5 m (21.3 ft)
Lanes
2
Daily Traffic
300
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.