TAYLOR CO RT 5/1 over GLADY CREEK

0.17 MI SOUTH CO RT 24 · County 091, West Virginia · Built 1917 · 1 Lanes · 50 vehicles/day

Overall
Fair
Superstructure
5
Fair

Bridge Details

Structure #
00000000046A011
Year Built
1917
Length
7.3 m (24 ft)
Max Span
7.3 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
50
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$191,000
Total Project Cost
$389,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.