I-79 SBL over CR 29

3.56 MI. N. OF CR. 29 · County 087, West Virginia · Built 1972 · 2 Lanes · 3,500 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
00000000044A136
Year Built
1972
Length
143.1 m (469.5 ft)
Max Span
59.4 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
3,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,000,000
Total Project Cost
$2,000,000