WEST VIRGINIA 74 over SPRING RUN

0.01 MILE SOUTH OF CR 10 · County 085, West Virginia · Built 2000 · 2 Lanes · 600 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
00000000043A179
Year Built
2000
Length
18.9 m (62 ft)
Max Span
17.7 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
600
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$700,000
Total Project Cost
$750,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.