COUNTY ROUTE 10 over SUGAR RUN
0.26 MILE W OF CR 50/40 · County 085, West Virginia · Built 1997 · 2 Lanes · 400 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
39.261711, -80.919153
This bridge is in worse condition than 46.5% of bridges in County 085. The average bridge in West Virginia is 0 years old; this one is 29 years old.
Nearby Bridges
COUNTY ROUTE 10 over SUGAR RUN
Built 1997
US 50 WBL over NORTH FK.HUGHES RIVER
Built 1969
US 50 EBL over NORTH FK.HUGHES RV.
Built 1969
COUNTY ROUTE 10 over SUGAR RUN
Built 1997
COUNTY ROUTE 50/40 over NORTH FORK HUGHES RIVER
Built 1929
CO RT 50/40 over SUGAR RUN
Built 1948
DODD CO RT 50/30 over DOTSON RUN
Built 1970
CR 10/4 over LYNNCAMP RUN
Built 1996
COUNTY ROUTE 10 over NORTH FORK HUGHES RIVER
Built 1994
DODDRIDGE CO RT 36 over DOTSON RUN
Built 1930
Bridge Details
- Structure #
- 00000000043A174
- Year Built
- 1997
- Length
- 12.8 m (42 ft)
- Max Span
- 11.5 m
- Width
- 7.5 m (24.6 ft)
- Lanes
- 2
- Daily Traffic
- 400
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $600,000
- Total Project Cost
- $650,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.