US 35 SB over Plantation Creek

0.1 MI South of CR 9 · County 079, West Virginia · Built 2019 · 2 Lanes · 12,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
00000000040A177
Year Built
2019
Length
207.9 m (682.1 ft)
Max Span
44.5 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
12,300
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.