WV 25 over ARMOUR CREEK

0.05 MI E OF CR 25/4 · County 079, West Virginia · Built 1935 · 2 Lanes · 13,400 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
00000000040A021
Year Built
1935
Length
11.8 m (38.7 ft)
Max Span
11 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
13,400
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$700,000
Total Project Cost
$1,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.