PRE. CO. RT. 42 over North Branch Snowy Creek

0.14 Mi. S. PRE. CO. 42/1 · County 077, West Virginia · Built 2011 · 2 Lanes · 700 vehicles/day

Overall
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
00000000039A243
Year Built
2011
Length
15.8 m (51.8 ft)
Max Span
14.6 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
700
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.