WV ROUTE 26 over CRAB ORCHARD RUN

0.89 MI SOUTH CO RT 26/22 · County 077, West Virginia · Built 1930 · 2 Lanes · 2,700 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
00000000039A052
Year Built
1930
Length
7.9 m (25.9 ft)
Max Span
7.3 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
2,700
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$221,000
Total Project Cost
$533,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.