PRESTON CO RT 7/3 over DILLAN CREEK

0.30 MI EAST WV RT 7 · County 077, West Virginia · Built 1987 · 1 Lanes · 90 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
00000000039A023
Year Built
1987
Length
7.4 m (24.3 ft)
Max Span
6.6 m
Width
3.6 m (11.8 ft)
Lanes
1
Daily Traffic
90
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$221,000
Total Project Cost
$442,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.