CR 3 over CAMP RUN

0.08 MI. N. OF CR 3/1 · County 071, West Virginia · Built 2008 · 2 Lanes · 250 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
00000000036A157
Year Built
2008
Length
11.2 m (36.7 ft)
Max Span
10.1 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
250
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.