US 250 Southbound over CR 18/2 & CR 24/1

0.07 mi. South jct CR18/2 · County 069, West Virginia · Built 1978 · 3 Lanes · 4,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
00000000035A119
Year Built
1978
Length
136.9 m (449.1 ft)
Max Span
39.6 m
Width
16.2 m (53.1 ft)
Lanes
3
Daily Traffic
4,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$674,000
Total Project Cost
$684,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.