Interstate 70 EB over Wheeling Creek/EB Ramps

1.08 mi. East jct US 40 · County 069, West Virginia · Built 1965 · 2 Lanes · 17,700 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
00000000035A067
Year Built
1965
Reconstructed
2021
Length
140.7 m (461.6 ft)
Max Span
28 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
17,700
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.