I 79 NB over Whiteday Crk & CR 73/01_

3.28 MI SOUTH CO RT 77 · County 061, West Virginia · Built 1969 · 2 Lanes · 22,800 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
00000000031A159
Year Built
1969
Length
151.6 m (497.4 ft)
Max Span
39 m
Width
11.2 m (36.7 ft)
Lanes
2
Daily Traffic
22,800
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,844,000
Total Project Cost
$2,979,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.