CR 3/5 over West Fk Twelvepole Creek

0.98 MI North of CR 3/1 · County 059, West Virginia · Built 2021 · 2 Lanes · 300 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
00000000030A296
Year Built
2021
Length
32.9 m (107.9 ft)
Max Span
32 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
300
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.