CO 13/9 over GILBERT CREEK

0.01 MILE WEST OF CR 13 · County 059, West Virginia · Built 1997 · 1 Lanes · 30 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
00000000030A202
Year Built
1997
Length
8.8 m (28.9 ft)
Max Span
8.5 m
Width
4.3 m (14.1 ft)
Lanes
1
Daily Traffic
30
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$142,000
Total Project Cost
$200,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.