CR 19/15 over NS RAILWAY

1.02 MI E OF CO 10/7 · County 055, West Virginia · Built 1992 · 2 Lanes · 150 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
00000000028A072
Year Built
1992
Length
30.1 m (98.8 ft)
Max Span
28.7 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
150
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$300,000
Total Project Cost
$400,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.