County Route 16/49 over Tug Fork

0.11 Mi. North Of US. 52A · County 047, West Virginia · Built 2015 · 1 Lanes · 250 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
00000000024A369
Year Built
2015
Length
21.3 m (69.9 ft)
Max Span
20.1 m
Width
6.5 m (21.3 ft)
Lanes
1
Daily Traffic
250
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.