CR 83/13 over RIGHT FORK

0.01 MI S OF CR 83/25 · County 047, West Virginia · Built 1978 · 2 Lanes · 600 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
00000000024A211
Year Built
1978
Length
8.8 m (28.9 ft)
Max Span
7.6 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
600
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$350,000
Total Project Cost
$400,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.