CR 80/1 over GUYANDOTTE RIVER

0.01 MI NORTH OF WV 80 · County 045, West Virginia · Built 1958 · 2 Lanes · 2,200 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
00000000023A090
Year Built
1958
Length
83.5 m (274 ft)
Max Span
24.7 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
2,200
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$100,000
Total Project Cost
$100,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.