I-79 (S) over US 19 (F)

5 Miles South of CO 19/39 · County 041, West Virginia · Built 2024 · 2 Lanes · 16,600 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
00000000021A221
Year Built
2024
Length
62.6 m (205.4 ft)
Max Span
27.4 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
16,600
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.