CR 79/2 over CABIN CREEK

0.5 MI S OF CR 79/3 · County 039, West Virginia · Built 2016 · 1 Lanes · 20 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
00000000020A870
Year Built
2016
Length
34.4 m (112.9 ft)
Max Span
33.5 m
Width
5.3 m (17.4 ft)
Lanes
1
Daily Traffic
20
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.