I-77 NB & SB over RAMP J (SIGNED RAMP A)

0.50 MI S OF US 60 · County 039, West Virginia · Built 1975 · 4 Lanes · 96,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
00000000020A645
Year Built
1975
Length
53.5 m (175.5 ft)
Max Span
21.4 m
Width
27.8 m (91.2 ft)
Lanes
4
Daily Traffic
96,600
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$300,000
Total Project Cost
$350,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.