I-77N over WV 114 GREENBRIER STREET

2.55 MI N OF US 60 · County 039, West Virginia · Built 1974 · 3 Lanes · 62,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
00000000020A418
Year Built
1974
Length
375.9 m (1233.3 ft)
Max Span
42.7 m
Width
17.1 m (56.1 ft)
Lanes
3
Daily Traffic
62,100
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.